| Willow Run built a B24 per hour. Are you denying that? (Im saying 60 minuts is more or less 56 minutes in the scheme of things).
The Lincoln was more or less a beefed up Lanc? Right?
And in 1943, the UK was not subject to the mass bomb raids of 1940 and 1941.
And your "shadow" factories would still be nearby the assembly plant(s).
__________________ "Pilot to copilot..... what are those mountain goats doing up here in the clouds?" |
| |
01-05-2006, 08:17 PM
|
#47 | | He who does not skim
Join Date: Nov 2004 Location: Halifax, Nova Scotia
Posts: 8,957
Country: | Boys this is all very well, but I have to ask. What the hell do production numbers have to do with the merits of the bomber itself? I thought this was supposed to be about the aircraft themselves, not so much the numbers produced. We're becoming bogged down with reasons why each nation could produce a certain number in a given period.
The B-24 served in every theatre of the war, but the Lancaster would have served in the PTO had the war dragged on a little longer. It was already in the works. Nothing hypothetical about it, it would have been there and it would have even had improvements. I happen to agree that the Liberator was an overall superb bomber, but to disqualify the Lancaster just because it didn't actually serve in the Pacific is a bit ridiculous as far as I'm concerned. It's akin to calling the F-4 Phantom superior to the F-22 just because of the F-4's actual combat record. It doesn't really prove anything one way or the other, and it's meaningless.
My god, I think this is the first time I've ever actually tried to steer a thread back on topic!
I think maybe I'd better lay down.  |
| |
01-05-2006, 09:06 PM
|
#48 | | IP/Mech THE GREAT GAZOO
Join Date: Apr 2005 Location: Colorado, USA
Posts: 12,969
Country: | Quote: |
Originally Posted by syscom3 I provided evidence that the B24 could be built in one hour. | One rolled out the door each hour - after being assembled - the subassemblies took at least a week to build, I would guess there were 5 or 6 of them comprising the B-24 (just like any other WW2 bomber)
Faster to build - YES Easier to build NO - you turn a bolt and drive a rivet the same way, the B-24 had the set up to do it the most efficently, but even then it wasn't 100% perfect....
__________________ "IF ITS RED OR DUSTY, DON'T TOUCH IT" |
| |
01-05-2006, 10:04 PM
|
#49 | | Senior Member
Join Date: Jun 2005 Location: Orange County, CA
Posts: 8,095
| The B24 was either by good fortune or by design, to be easily mass produced. I havent really looked at in detail the B17 center section, but there was somehting different between the two that favored the B24 for mass production.
__________________ "Pilot to copilot..... what are those mountain goats doing up here in the clouds?" |
| |
01-05-2006, 10:29 PM
|
#50 | | IP/Mech THE GREAT GAZOO
Join Date: Apr 2005 Location: Colorado, USA
Posts: 12,969
Country: | Quote: |
Originally Posted by syscom3 The B24 was either by good fortune or by design, to be easily mass produced. I havent really looked at in detail the B17 center section, but there was somehting different between the two that favored the B24 for mass production. | Yes - Ford Motor Company designing a 1 1/2 mile production line around the aircraft!
Actually in the history of aircraft manufacturing, very few aircraft had that luxury, especially for an aircraft that was already in production...
__________________ "IF ITS RED OR DUSTY, DON'T TOUCH IT" |
| |
01-06-2006, 04:49 AM
|
#51 | | Master of Ewes
Join Date: Dec 2003
Posts: 19,959
Country: | sys it proves nothing, willow run alone emplyed more people than the entire A.V. Roe production group! go back to my toilet seat example, and almost anything can be mass produced, no matter what it is, especailly if you have a 1 1/2 mile assembly line
i'm with everyone else, you're the one that started the whole easier to build stuff, but let's get back to the lanc's statistical superiority.........
__________________ 
"Reminds me of the time I sank the Tirpitz" comments a Spitfire pilot, "One pass of course, old boy." |
| |
01-06-2006, 04:59 AM
|
#52 | | Master of Ewes
Join Date: Dec 2003
Posts: 19,959
Country: | Quote: |
Originally Posted by syscom One of them is the Lanc experts | if you meant me i never claimed to be a lancaster expert at all, i know i have allot more to learn, it's jsut that i know more than most Quote: |
didnt have any information about the production untill I made them go dig up the info
| ok so i didn't know the figures off memory, what does that prove? everyone here uses books no one's gonna say the B-24's better because i had to use a book 
__________________ 
"Reminds me of the time I sank the Tirpitz" comments a Spitfire pilot, "One pass of course, old boy." |
| |
01-06-2006, 12:10 PM
|
#53 | | Senior Member
Join Date: Jun 2005 Location: Orange County, CA
Posts: 8,095
| statistics can prove anything. I was looking at your figures and its comparing apples to oranges.
A better statistical comparison would be B24 and Lanc stats for night missions and B24 and lanc stats for day missions.
Now back to the production details. The simple fact is the Lanc was built by twice as many factories as the B24, yet only produced less than 1/2 of them. And all those factories building the lanc were geographically close to each other (except the Canadian plant).
It doesnt matter if the Willow Run plant was 1.5 miles long. It could have easily been split up into smaller buildings and still be able to produce the same number of aircraft.
__________________ "Pilot to copilot..... what are those mountain goats doing up here in the clouds?" |
| |
01-06-2006, 12:38 PM
|
#54 | | He who does not skim
Join Date: Nov 2004 Location: Halifax, Nova Scotia
Posts: 8,957
Country: | You boys are really stuck on this production debate, aren't ya? There's not much to discuss really. The US had the most production going in every area, employing the most economical methods. Short 'n sweet if you ask me. |
| |
01-06-2006, 12:53 PM
|
#55 | | IP/Mech THE GREAT GAZOO
Join Date: Apr 2005 Location: Colorado, USA
Posts: 12,969
Country: | Quote: |
Originally Posted by syscom3 It doesnt matter if the Willow Run plant was 1.5 miles long. It could have easily been split up into smaller buildings and still be able to produce the same number of aircraft. | Yes it does - inside these large buildings Architechs need to set up pillars and columns to support the roof. It it's designed around an aircraft configuration (size) you have more floor space to configure assembly. That's why Lockheed had to build plant 10 in Palmdale, there was nothing in Burbank to support the size of the then new jet. Notice how plant to has one set a pillars down the middle. One side of the line assembled the fuselage barrels, flightstation and tail, the wings were built at an outside supplier and shipped in and assembled at a specific station. Final assembly ran up the other side of the building....
Boeing had to do the same thing for the 747 assembly line
You need to be able to flow sub assemblies into their "station." Willow run was successful because all of the sub assembly movement was designed around the aircraft and then the building designed around that!
Unless you are talking about a substantial difference in size there is no difference in driving rivets into a B-24, -17 or Lancaster, it was a matter of resources, people and production efficiency that determined the production numbers...
__________________ "IF ITS RED OR DUSTY, DON'T TOUCH IT" |
| |
01-06-2006, 12:55 PM
|
#56 | | IP/Mech THE GREAT GAZOO
Join Date: Apr 2005 Location: Colorado, USA
Posts: 12,969
Country: | Quote: |
Originally Posted by Nonskimmer You boys are really stuck on this production debate, aren't ya? There's not much to discuss really. The US had the most production going in every area, employing the most economical methods. Short 'n sweet if you ask me. | I agree! Although its fun showing this to someone who never built an airplane before.... 
__________________ "IF ITS RED OR DUSTY, DON'T TOUCH IT" |
| |
01-06-2006, 01:16 PM
|
#57 | | He who does not skim
Join Date: Nov 2004 Location: Halifax, Nova Scotia
Posts: 8,957
Country: | Ah, gotcha. Great pics by the way.  |
| |
01-06-2006, 01:19 PM
|
#58 | | Senior Member
Join Date: Jun 2005 Location: Orange County, CA
Posts: 8,095
| If the Lanc was as easy to build, then they should have been able to build them faster. You would see the production blocks being completed sooner, and then output drop as subassemblies are used up.
And its still irrelevent whether Willow Run was 1.5 miles long or a series of buildings of shorter lenghts. The sub assemblies could be built anywhere and brought in by truck or train, when it was needed.
__________________ "Pilot to copilot..... what are those mountain goats doing up here in the clouds?" |
| |
01-06-2006, 02:00 PM
|
#59 | | IP/Mech THE GREAT GAZOO
Join Date: Apr 2005 Location: Colorado, USA
Posts: 12,969
Country: | Quote: |
Originally Posted by syscom3 If the Lanc was as easy to build, then they should have been able to build them faster. You would see the production blocks being completed sooner, and then output drop as subassemblies are used up. | I never said easier - my point is the same as far as producibility and assembler skill. The B-24 was superior in numbers because of resources and production planning. Quote: |
Originally Posted by syscom3 And its still irrelevent whether Willow Run was 1.5 miles long or a series of buildings of shorter lenghts. The sub assemblies could be built anywhere and brought in by truck or train, when it was needed. | And that is exactly how it is done, but how long to you think it takes to build say the nose section of a B-24 as a sub assembly? You can't build it in a machine (If there were limited internal structure a machine called a drivematic cane be used) it has to be located in an assembly jig and because of the size there is a space restriction on how many bodies can effectively assemble the thing. Two weeks per sub assembly and that's pushing it...
Oh it would be the same for the Lancaster.....
__________________ "IF ITS RED OR DUSTY, DON'T TOUCH IT" |
| |
01-06-2006, 02:13 PM
|
#60 | | Senior Member
Join Date: Jun 2005 Location: Orange County, CA
Posts: 8,095
| If you have all the componants needed to build a sub assembly, it can be built in no time at all. Theres nothing complicated at all about the assembly. You can even send to the assembly line partially completed sub assemblies that are at least structurally complete (hold up the final assembly line cause the nose turret isnt available?).
If the sub assembly is small enough, smaller feeder factories can build them according to the production requirements. If Willow Run needed "x" number of Rudder assemblies made each day, then its just a matter of how many jigs and people are needed. If the factory is "x" miles away, then all they have to do is just factor in the transport time and deliver it when its needed.
__________________ "Pilot to copilot..... what are those mountain goats doing up here in the clouds?" |
| | | Thread Tools | Search this Thread | | | | | Display Modes | Linear Mode |
Posting Rules
| You may not post new threads You may not post replies You may not post attachments You may not edit your posts HTML code is Off | | | All times are GMT -5. The time now is 08:14 AM. |  | |